A Selection Of Projects Undertaken By Bolts Of Hereford, Detailing The Works We Completed.

Example Refurbishment Projects:

Halo Leisure Refurbishment

Halo Leisure

Halo Leisure, we have carried out a wide range of services for Halo Leisure whilst refurbishing their leisure facilities. We have fitted new reception areas, changing rooms, first aid rooms and offices; incorporating new ceilings, floorings, drylining and partitioning, joinery work, and decorations. Always working around open facilities, liaising closely with the centre managers.

Denco Ltd Refurbishment

Denco

We refurbished Denco Ltd's new head offices, at Moreton near Hereford. We undertook all internal aspects of the refurbishment. We project managed the internal works, with a strong team of fitters on the ground installing wall linings, partitions, suspended ceilings. This was a large contract for Bolts Of Hereford and a testimonial as to the efficiency, workmanship and quality of our work can be found on the testimonial page.

Roland Hill Shopping Centre Refurbishment

Roland Hill Shopping Centre

The shopping arcade was having a refurbishment and this included new MF plasterboard ceilings. The plasterboard ceilings covered a large floor plan at height requiring MEWP(Mobile Elevating Work Platform) access. The ceilings incorporated areas and runs of open cell tiles, and slopes up to rooflights which were formed with light boxes, which incorporated coloured lighting.

Amey Wye Valley Office Refubishment

Amey Wye Valley

We carried out the internal refurbishment of warehouse space to create new offices for Amey Consulting. We drylined and painted the walls, installed a suspended ceiling, and cavity fire barrier. We installed a new air conditioning system with fresh air feed, installed new power and lighting including power poles and dado trunking. Created new openings to create an open plan feel with the adjacent office space, supplied new carpet to the area, and removed an electric roller shutter and installed a new glazed screen.

David Austin Roses Refurbishment

David Austin Roses

We were given an empty steel shell with a mezzanine floor, and proceeded to turn it into usable workable office space. Over the two floors we; drylined the exterior walls, installed plasterboard partitioning to create offices which we taped, filled and decorated, hung fire doors, installed firewalls, and cavity fire barrier above the new one hour fire rated suspended ceiling. We installed a new air conditioning system to the office areas, installed new kitchens and toilets.

Anchor Van Leasing Refurbishment

Anchor Van Leasing

We installed a new one hour fire rated 146mm partion wall down the length of the warehouse to create an area suitable for offices one side, while the other area was prepared for an MOT bay. We then proceeded to install new one hour suspended ceilings to both floors, install new partitions to create offices, kitchens, and toilet and shower areas, and fit window sills.

Central Roofing Refurbishment

Central Roofing

It was very obvious from the start that only the very highest standards were going to meet Central's Expectations. A quick view of the finished offices proves this to be true. We supplied new Microlook tiles in a 15mm grid for an aesthetically pleasing ceiling finish, installed new plasterboard partitions for offices and fitted new full height glazed partitioning to create a boardroom.

Refurbishments Carried Out For Herefordshire Council

Herefordshire Council

We have carried out suspended ceiling, partitioning, decorating and flooring works for Herefordshire Council Property Services in and around the county. This has mainly been in schools and offices.